Custom development

Integrations, internal tools, and automation built to fit your architecture and handed over with source, documentation, and a walkthrough.

When this is the right fit

  • The gap between two systems is being filled by a person

    Someone re-keys data, reconciles files, or runs a manual step every week.

  • The available product does far more than you need

    A vendor product covers twenty functions when you need two of them connected to your systems.

  • An earlier build has become a liability

    A tool written years ago still runs, but nobody can change it and the person who wrote it has left.

What changes

  • Built to the architecture

    Anything we build connects through the integration layer and follows the standards already set.

  • Handed over with documentation

    Documentation, source, and a walkthrough with your team are part of the deliverable.

  • Designed and built together

    The build is done by the architects who designed it, against the target architecture.

What you get

  • Scoped build with a written definition of done
  • Source code, documentation, and deployment notes owned by you
  • Walkthrough and hand-off to the people who will maintain it
  • A support arrangement if you want one, sized to the build

How an engagement runs

Assessment, plan, build. Each phase ends with a written result you keep.

  1. 1Assessment

    A few weeks of looking at what you have: systems, integrations, customizations, and the people who keep them running. You get a written picture of the current state and a ranked list of what to change first.

  2. 2Plan

    A target architecture and a phased plan: the order of work, what each phase depends on, and a cost estimate. The first phase is sized to deliver something you can use.

  3. 3Build and hand off

    We do the work alongside your team. Documentation and knowledge transfer are part of every phase. Your team owns the result.

Related work

Describe the gap

Describe the two systems and the manual step between them. We will say whether the answer is a build, a configuration change, or a product.